Public Works Department (DPU) of Tegal Regency in 2018 has
formed a quick response maintenance unit that is in charge of carrying out
road maintenance. The type of asphalt used to repair the road is cold mix
asphalt.
The objectives of this study are: 1. To find out the procedures for
carrying out road maintenance through a quick response maintenance at
the Public Works Department (DPU) Tegal Regency. 2. To find out the
procedure for using cold mix asphalt as material for road repairs at the
Public Works Department (DPU) of Tegal Regency.
The procedure for maintaining the road through a quick response
maintenance at the Public Works Department (DPU) of Tegal Regency with
the cold mix method is as follows: 1. Initial assessment after complaints
from the public. 2. Direct inspection to the field, 3. Determination of the
authority and responsibility on the inspected road of the Unit Quick
Response Maintenance of the DPU of Tegal Regency, 4. Implementation of
road handling using cold mix asphalt and aggregate.
The way to use the asphalt cold mix conducted by Unit Quick
Response Maintenance of the DPU of Tegal Regency is as follows: the
holes in the road are cleaned, preparing asphalt emulsion, the holes are
with emulsion evenly, if the hole depth is more than 5-10 cm, then filled
with aggregates 2/3 and or 1/2, laying the cold mix asphalt in the hole
evenly, compacting the expanse with the iron wheel or stamper, and
finished, the road ready to be used.
The procedure for maintaining the road through a quick response
maintenance at the DPU of Tegal Regency with the cold mix method has a
time efficiency value of 600% which is obtained from the distribution of
time needed for maintenance with the hot mix asphalt method as much as 6
hours compared to the time required by the asphalt cold mix method for 1
hour.
Recommendation suggestions to related parties as follows: need to
increase the budget for road maintenance activities especially in the Quick
Response Maintenance DPU of Tegal Regency so that materials and
equipment are available in sufficient quantities so that the handling of road
damage can be maximized, and more intensive socialization needs to be
carried out to the community. |