STUDI PERBANDINGAN HARGA SATUAN PEKERJAAN PROYEK PEMBANGUNAN GEDUNG PUSKESMAS KEDUNGBANTENG DENGAN METODE ANALISA BOW, SNI, DAN LAPANGAN

Show full item record

Title: STUDI PERBANDINGAN HARGA SATUAN PEKERJAAN PROYEK PEMBANGUNAN GEDUNG PUSKESMAS KEDUNGBANTENG DENGAN METODE ANALISA BOW, SNI, DAN LAPANGAN
Author: FUADDI, SAMSUL
Abstract: In a construction project, cost estimates play an important role in project implementation. To improve the efficiency and effectiveness of building and building activities in the construction sector, a basic means of unit price calculation is needed, namely Construction Cost Analysis. Contractors generally make bid prices based on analysis that are not entirely guided by BOW (Burgelijke Openbare Werken) analysis or SNI analysis (Indonesian National Standardization). The contractors are more likely to calculate the unit price of work based on their own analysis based on previous experience in completing a construction work, even though it cannot be separated from the analysis of BOW and SNI. Research methods in analyzing the Budget Plan (RAB), namely with BOW, SNI and Contractor Calculation Method. From the calculation of each analysis of the existing budget plan, a comparison of the cost budget plan is obtained between the BOW, SNI and Contractor Calculation Methods. An economical budget plan using the Contractor Calculation Method, which is Rp.104.192,00, while the results of analysis of the BOW budget plan are Rp. 222.444,00, while the analysis of the SNI budget plan is Rp.127.450,00
URI: http://192.168.252.215:8080/xmlui/handle/123456789/1038
Date: 2021-11-03