STUDI IMPLEMENTASI PEMAKAIAN KALSAIFLOOR PENGGANTI COR BETON PADA BANGUNAN GEDUNG RSIA PERMATA INSANI KABUPATEN BREBES

UMUS Repository

STUDI IMPLEMENTASI PEMAKAIAN KALSAIFLOOR PENGGANTI COR BETON PADA BANGUNAN GEDUNG RSIA PERMATA INSANI KABUPATEN BREBES

Show simple item record

dc.contributor.author AZHARI, SUCI
dc.date.accessioned 2025-12-12T06:58:27Z
dc.date.available 2025-12-12T06:58:27Z
dc.date.issued 2021-11-03
dc.identifier.uri http://192.168.252.215:8080/xmlui/handle/123456789/1049
dc.description.abstract The construction project of the Permata Insani Brebes Mother and Child Hospital building is functioned to meet the community's need for a private hospital with excellent health services for mothers and children. At this time the technological progress of the construction world is growing rapidly. Various ways to continue to be done to improve the quality of work. Various building materials and good workmanship continue to be sought for the advancement of the quality of human life. Likewise with the method of implementing floor slabs using floor slabs and calcifloor roofs to speed up and simplify the work of floor slabs in high-rise buildings. This study aims to determine the method of carrying out floor slab work using kalsifloor, the method of implementing floor slab work using kalsifloor, and to determine the difference in the cost of working on cast concrete floor slabs and calcifloor floor slabs. This research is expected to add knowledge and insight about the implementation of concrete work, especially regarding the work of calcifloor floor slabs in the field. This research was carried out at the Permata Insani RSIA construction project, JL. Yos Sudarso, Batang Market, Brebes Regency. Data collection methods used are field observations, interviews, and documentation. From the results of this study it can be concluded that the cost of implementing the concrete floor slab is more expensive than the kalsifloor floor slab, with a price difference of Rp. 18,371,501.10 and the work time difference is 78.05 days, the use of calcifloor is faster than conventional concrete floor slabs. en_US
dc.subject concrete floor slab, calcifloor floor slab en_US
dc.title STUDI IMPLEMENTASI PEMAKAIAN KALSAIFLOOR PENGGANTI COR BETON PADA BANGUNAN GEDUNG RSIA PERMATA INSANI KABUPATEN BREBES en_US


Files in this item

Files Size Format View
TS_22201170018_Suci Azhari.pdf 2.088Mb PDF View/Open

This item appears in the following Collection(s)

Show simple item record