PERENCANAAN SARANA DAN PRASARANA BUS RAPID TRANSIT (BRT) TRANS SEMARANG KORIDOR VI UNDIP-UNNES BERDASARKAN ANALISIS KEPUASAN PENUMPANG (Koridor VI UNDIP-UNNES, Menggunakan Metode SPSS 2.2)

UMUS Repository

PERENCANAAN SARANA DAN PRASARANA BUS RAPID TRANSIT (BRT) TRANS SEMARANG KORIDOR VI UNDIP-UNNES BERDASARKAN ANALISIS KEPUASAN PENUMPANG (Koridor VI UNDIP-UNNES, Menggunakan Metode SPSS 2.2)

Show simple item record

dc.contributor.author NIZAM, ACHMAD
dc.date.accessioned 2025-12-18T06:38:55Z
dc.date.available 2025-12-18T06:38:55Z
dc.date.issued 2022-08-01
dc.identifier.uri http://192.168.252.215:8080/xmlui/handle/123456789/1176
dc.description.abstract Trans Semarang is a BRT (Bus Rapid Transit)-based mass transportation service that operates in the city of Semarang. This bus is operated to relieve congestion in the city of Semarang which is increasing. The thing that distinguishes Trans Semarang from other city buses is the automatic door which is located higher, so that passengers can only board at the BRT stop (also known as the shelter). This is what makes it the same as the Transjakarta busway concept, even though Trans Semarang does not have a special BRT lane. Trans Semarang Corridor IV was inaugurated on Monday, March 31, 2017, in the Rectorate yard of the Widya Puraya campus, Tembalang campus, Diponegoro University, which was the longest corridor at the time of its launch. With routes from Meteseh, Tembalang, PRPP, and using the 2016 Ministry of Transportation assistance fleet (same fleet as Trans Jogja).Now in the operational journey, Trans Semarang prioritizes safety, comfort, reliability, affordable and environmentally friendly factors which are the main things in service to the community. So that researchers are interested in analyzing the operational performance of the Trans Semarang Bus, especially the corridor VI line which operates in 2017. This analysis includes in terms of loading factors, the number of up and down passengers, travel time, passenger comfort and passenger satisfaction survey analysis. en_US
dc.subject Trans Semarang, Load Factor, Headway, Bus Rapid Transit, Travel Time, Service, Passenger Comfort en_US
dc.title PERENCANAAN SARANA DAN PRASARANA BUS RAPID TRANSIT (BRT) TRANS SEMARANG KORIDOR VI UNDIP-UNNES BERDASARKAN ANALISIS KEPUASAN PENUMPANG (Koridor VI UNDIP-UNNES, Menggunakan Metode SPSS 2.2) en_US


Files in this item

Files Size Format View
22201180024- ACHMAD NIZAM.pdf 3.059Mb PDF View/Open

This item appears in the following Collection(s)

Show simple item record